IN-PIT TAILINGS STORAGE FACILITY (IPTSF) FOR FÉNIX PROJECT
The client required the development of a modification to the existing Environmental Impact Assessment for the placement of in-pit tails (IPTSF) from the proposed heap leach reprocessing project.
Solum’s Scope
Solum managed all the aspects of the permitting required for the in-pit tailings storage facility for the Fenix Project (formerly called “El Gallo”). Solum developed a wide range of technical studies including industry experts to support the modification to the environmental impact assessment and therefore, obtain the necessary environmental permits. The scope included a field investigation and the integration of the hydrogeological, geochemical, risk, hydrology and tailings management studies.
Solum’s Achievements
Successful permitting for the IPTSF.
Client
McEwen Mining
Location
Sinaloa, México
Highlights
- Permitting support
- Environmental studies
- Hydrogeological Field Investigation
- Presentations to the environmental authorities on behalf of the client
- Technical/Environmental support
- Modification to the MIA
- Preventive Report (IP)